Work at the shop is still going strong. The well and mini split heat pump were installed today as well as the window and door casings. Progress!
The drywall is up and extra touches are being added. Shop made ship lap using 3/8” BC plywood and ripped to 6” wide, rabbeted, and installed with 1/4” spacers are going up as well. The ship lap will be on three of the walls floor to ceiling.
Metal roof is done on the shop. Doors and windows will be coming coming this week to install and the rough in electrical will get started this week as well. Busy days ahead at Thomas Woodworks!